[twentytwenty]1-13-2008 1-21-55 PM_0002

IMG_8845

 

[/twentytwenty]

We don’t watch a lot of TV, but we do like to watch those Fixer Upper shows, due mainly because of the ideas they inspire in us, and February seems to be a good month, in this part of the world, to work inside on house projects.

A couple of winters ago, we decided that the downstairs ‘den’ was too dark and needed a complete rehab.

file_140-  First all the barn boards and fake rafters were removed
 1-13-2008 1-35-01 PM_0008  Next the mantel was removed.
 file_156-IMG_1173 Heavy stone ‘plinth’ had to go  it was about 18″ deep and made of three pieces.  Quite a job to remove – we decided to keep it but half the depth.  The diamond saw made short work of cutting the slate. It was a little unwieldy trying to cut a line freehand, so I used a 2×4 as a guide.  I gained a whole new respect for road workers – when that thing was cutting there was so much dust in the air.
 [twentytwenty]IMG_1123IMG_1126[/twentytwenty] ‘Detailed drawing’ of the final look of the fire place.
We wanted an Adams style, similar to one we had built in England.  Simple and elegant.New supports for narrower plinth going in.Once the plinth was removed and the slate cut – I needed to re-tile the hearth.
 IMG_1145  Sheetrock going in, glued and screwed to the bricks.
 IMG_1203 New plinth leveled and in place and the fire surround starting to take shape.  The main backing was 3/4″ MDF glued and screwed to the bricks.
 IMG_1251IMG_1245 Building out the fire surround using poplar and various mouldings. All joints are mitered, glued and pinned.
IMG_1261IMG_8846 Old wooden mantel (pine) was planned to 3/4″ and cut to shape.  The walls below the mantel were wall papered and the red bricks painted.
IMG_8845